Browse publication-approved energy projects and delivery requirements.
Each project card shows the information authorised for public review, including owner, country, project environment, stage, timeframe and capability sought. Use the filters to find relevant projects, then request a discussion where your organisation has a credible delivery role.
UKIEE does not disclose confidential procurement information and does not guarantee introductions, supplier approval or contracts.
The Project Room
El Salvador Transmission Network Expansion — ETESAL
Project owner: ETESAL — Empresa Transmisora de El Salvador
Country: El Salvador
Project environment: Electricity transmission infrastructure
Project function: Transmission-network expansion, modernisation and digitalisation
Region: Central America
Stage: Preliminary studies
Timeframe: Manufacturing and delivery: 1 year or less; anticipated procurement / implementation: 2 years or less
Capability sought: EPC providers; GIS substations; transformers; transmission lines; digitalisation; predictive maintenance; AI; social/environmental engineering; equipment manufacturers; O&M technology; project finance/investment; research cooperation
Transmission-network expansion and modernisation requirements supplied by ETESAL, including EPC capability, grid equipment, digitalisation, predictive maintenance, AI, O&M technology, finance and research cooperation.
View project details
Areas of interest
- National transmission-network expansion: GIS substations, transformers and transmission lines.
- Digitalisation of transmission operations.
- Predictive maintenance.
- AI applications in electricity-system management.
- Engineering and specialist project-delivery capability in social and environmental studies.
- Qualified international equipment manufacturers.
- Operations and maintenance technologies.
- Project finance and infrastructure investment.
- International research and institutional cooperation.
Delivery information supplied to UKIEE
- Current stage: preliminary studies.
- Principal engineering / technical requirement: EPC providers.
- International supply-chain requirement: manufacturing and delivery in one year or less.
- Anticipated procurement / implementation timing: two years or less.
No published projects match those filters. Clear the filters or check again as new projects are added.

